1.0 Objective

The objective of this Installation Qualification Protocol is to define the requirements and acceptance criteria required to generate documented evidence for satisfactory installation of Rapid Mixer Granulator, installed in Production area,

This protocol aims to provide an outline for the inspection of equipment for static attributes to verify that:

  • Each installed sub-component complies with the requirement specification(s).

  • SOPs have been identified and listed

  • All critical instrumentation has been identified for calibration of the equipment.

  • All supporting utilities are properly connected.

  • The system installation meets acceptance criteria.

2.0 Scope

The scope of this Installation Qualification Protocol is limited to the Rapid Mixer Granulator, installed in Production area.

5.0 Installation Qualification Test Matrix

The following test(s) / verifications must be completed successfully for a satisfactory

TEST NUMBER

CRITICAL TEST PARAMETERS

1

Verification of Installation

2

Documents & Drawings Verification

3

Identification & Verification of Major component

4

Verification of Utility

5

Identification of Critical Instruments for Calibration

6

Identification of Standard Operating Procedures

7

Identification of Safety Feature/Interlocks

8

Identification of Hard to Clean Location

9

Verification of Material of Construction, Surface Finish and Product Contact Surface area of the Parts

10

Verification of Spare Parts and Recommended Lubrications

For Complete Protocol- Click on Read more and Download



1.0 Objective

The objective of this Installation Qualification Protocol is to define the requirements and acceptance criteria required to generate documented evidence for satisfactory installation of Egg shell blender, installed in Production area,

This protocol aims to provide an outline for the inspection of equipment for static attributes to verify that:

  • Each installed sub-component complies with the engineering design and equipment data sheet/ specification.

  • The system is installed according to the design specification and manufacturer’s recommendation.

  • The system meets the cGMP and all other regulatory requirement.

  • No unauthorized and unrecorded modification has taken place.

  • SOPs have been identified and listed

  • All critical instrumentation has been identified for calibration of the equipment.

  • All supporting utilities are properly connected.

  • All testing reports are available and maintained on file 

  • Ensure that the system installation meets acceptance criteria.

2.0 Scope

The scope of this Installation Qualification Protocol is limited to the Egg shell blender, installed in Production area.

5.0 Installation Qualification Test Matrix

The following test(s) / verifications must be completed successfully for a satisfactory

TEST NUMBER

CRITICAL TEST PARAMETERS

1

Verification of Installation

2

Documents & Drawings Verification

3

Identification & Verification of Major component

4

Verification of Utility

5

Identification of Critical Instruments for Calibration

6

Identification of Standard Operating Procedures

7

Identification of Safety Feature/Interlocks

8

Identification of Hard to Clean Location

9

Verification of Material of Construction, Surface Finish and Product Contact Surface area of the Parts

10

Verification of Spare Parts and Recommended Lubrications

For Complete Protocol- Click on Read more and Download



1.0 Objective

The objective of this Installation Qualification Protocol is to define the requirements and acceptance criteria required to generate documented evidence for satisfactory installation of Compression Machine, installed in Production area,

This protocol aims to provide an outline for the inspection of equipment for static attributes to verify that:

  • Each installed sub-component complies with the requirement specification(s).

  • SOPs have been identified and listed

  • All critical instrumentation has been identified for calibration of the equipment.

  • All supporting utilities are properly connected.

  • The system installation meets acceptance criteria.

2.0 Scope

The scope of this Installation Qualification Protocol is limited to the Compression Machine, installed in Production area.

5.0 Installation Qualification Test Matrix

The following test(s) / verifications must be completed successfully for a satisfactory

TEST NUMBER

CRITICAL TEST PARAMETERS

1

Verification of Installation

2

Documents & Drawings Verification

3

Identification & Verification of Major component

4

Verification of Utility

5

Identification of Critical Instruments for Calibration

6

Identification of Standard Operating Procedures

7

Identification of Safety Feature/Interlocks

8

Identification of Hard to Clean Location

9

Verification of Material of Construction , Surface Finish  and Product Contact Surface area of the Parts

10

Verification of Spare Parts and Recommended Lubrications

For Complete Protocol- Click on Read more and Download

 



1.0 Objective

The objective of this Installation Qualification Protocol is to define the requirements and acceptance criteria required to generate documented evidence for satisfactory installation of Auto Coating Machine, installed in Production area,

This protocol aims to provide an outline for the inspection of equipment for static attributes to verify that:

  • Each installed sub-component complies with the requirement specification(s).

  • SOPs have been identified and listed

  • All critical instrumentation has been identified for calibration of the equipment.

  • All supporting utilities are properly connected.

  • The system installation meets acceptance criteria.

2.0 Scope

The scope of this Installation Qualification Protocol is limited to the Auto Coater Machine, installed in Production area.

5.0 Installation Qualification Test Matrix

The following test(s) / verifications must be completed successfully for a satisfactory

TEST NUMBER

CRITICAL TEST PARAMETERS

1

Verification of Installation

2

Documents & Drawings Verification

3

Identification & Verification of Major component

4

Verification of Utility

5

Identification of Critical Instruments for Calibration

6

Identification of Standard Operating Procedures

7

Identification of Safety Feature/Interlocks

8

Identification of Hard to Clean Location

9

Verification of Material of Construction , Surface Finish  and Product Contact Surface area of the Parts

10

Verification of Spare Parts and Recommended Lubrications

For Complete Protocol- Click on Read more and Download

 



1.0 Objective

The objective of this Installation Qualification Protocol is to define the requirements and acceptance criteria required to generate documented evidence for satisfactory installation of Fluid Bed Dryer, installed in Production area,

This protocol aims to provide an outline for the inspection of equipment for static attributes to verify that:

  • Each installed sub-component complies with the requirement specification(s).

  • SOPs have been identified and listed

  • All critical instrumentation has been identified for calibration of the equipment.

  • All supporting utilities are properly connected.

  • The system installation meets acceptance criteria.

2.0 Scope

The scope of this Installation Qualification Protocol is limited to the Fluid Bed Dryer, installed in Production area.

5.0 Installation Qualification Test Matrix

The following test(s) / verifications must be completed successfully for a satisfactory

TEST NUMBER

CRITICAL TEST PARAMETERS

1

Verification of Installation

2

Documents & Drawings Verification

3

Identification & Verification of Major component

4

Verification of Utility

5

Identification of Critical Instruments for Calibration

6

Identification of Standard Operating Procedures

7

Identification of Safety Feature/Interlocks

8

Identification of Hard to Clean Location

9

Verification of Material of Construction , Surface Finish  and Product Contact Surface area of the Parts

10

Verification of Spare Parts and Recommended Lubrications